Monday, April 20, 2009

Lake Projects

It is now less than four weeks until my sabbatical begins!

To help focus my thoughts I am including a list of possible improvements--projects large and small to keep me busy for the first 6 or 7 weeks before the wedding.

The big goal for these projects is to make our lake place a more hospitable place for the many guests that we expect before and after the wedding.

So, in no particular order...

Parking improvements:
  • Main parking area: Outline with logs, level-out with gravel. (20-30 cu. yds roadmix).
  • Lower parking (east side, just above the pizza oven): Rake out level, maintain for possible tent site.
  • Upper parking (east side, just below the mailbox): Grade level, add logs to define parking spots.
  • Loop road: Repair ruts on westside, possibly add gravel roadmix.

Cleanup:

  • Cut and stack all firewood left from tree thinning.
  • Cleanup beach. Cut and stack beach wood.
  • Cleanup old trash pile inside the loop road.
  • Clean out under porches.
  • Clean out under cabin.
  • Clean out closets, cabinets.
  • Clean out and reorganize tool cabinets.

Sanitation:

  • Remove old outhouse.
  • Rebuild with composting style outhouse.
  • Build new composting bins.
  • Solar shower.
  • Repair water line.

Paths, Tent sites:

  • Maintain tent sites, rake and level as needed.
  • Repair rockery, path to dock.
  • Repair stone steps to bunkhouse.
  • Rebuild lower rockery between pizza oven area and beach.
  • Increase accessibility of path on east side of the cabin.
  • Possibly build Adirondack shelter from logs.

Pizza Oven:

  • Lay paving stones in the hearth area.
  • Build work tables.
  • Build benches, new picnic table.
  • Mow and water grass around oven.

Inside Projects:

  • Clean and oil woodwork in cabin.
  • Sand and oil floor in bunkhouse.
  • New bed for bunkhouse.

Other Projects:

  • Bird houses, bat houses.
  • Remove, repair upholstery in SeaDoo.
  • Weed patrol.
  • Prune bushes near paths.
  • Minor repairs to rowing shell.
  • Sand, paint rowing shell.
  • Build boat rack for canoe, kayaks.
  • New paddles for canoe.
  • New oarlocks for blue rowboat.
  • Quick-mount for rod-holder in blue rowboat.
  • Clean up driftwood in little bay.
  • Build benches or chairs out of the driftwood.
  • Check dock for any needed repairs.

No comments:

Post a Comment